Company News

Shandong Junhao fights the epidemic and resumes work to meet deadline

During the Spring Festival of Gengzi, the Chu land suffered a major epidemic, which spread throughout China. The dragon in February was about to rise, and the order to seal off the city in Lu was not resolved. The construction project of Shandong Junhao High-Performance Polymerization was seriously hindered. The company’s external liaison personnel actively raised epidemic prevention materials and applied for resumption of work. The Management Committee of Jingjining New Materials Industrial Park conducted on-site acceptance. On February 23, some employees of the company returned to the factory to resume work to promote project construction and seize the delayed construction period.


q.jpg


To ensure the smooth resumption of work after the epidemic, the company has established a strict factory registration system. Personnel entering the factory must wear masks and undergo temperature checks. At the same time, they must sign a responsibility statement for epidemic prevention in accordance with the requirements of the local government and report the activity trajectory of family members after 1 month and 20 days.

After entering the factory, everyone took active action and thoroughly disinfected the office, canteen, and toilet. After the environment was cleaned, the office staff immediately went to work, and the construction workers on the construction site also raced against time to build the factory.


qq.jpg

qqq.jpg


In the face of the pandemic, we must ensure both epidemic prevention and construction. Junhao people are fulfilling their original mission with actions, taking on responsibilities and striving to put the project into production as soon as possible.

CopyRight © 2019- 2025   Shandong Junhao High Performance Polymer Co., Ltd Copyright